We are currently upgrading the store. Please contact us directly if you have any product queries and require current and accurate pricing.

Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel

USD $277.88

Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel

SKU: DDP.AENEW-GHJG Categories: ,

Description

Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what’s known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Additional information

Weight 4 kg
Dimensions 10.5 × 3.5 × 3.5 cm