We are currently upgrading the store. Please contact us directly if you have any product queries and require current and accurate pricing.

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

USD $2,644.44

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

SKU: DDP.AE-1-GHJG Categories: ,

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Additional information

Weight 27 kg
Dimensions 12 × 17 × 9 cm